RTS XCP-ADAM-MC Bedienungsanleitung Seite 23

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 28
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 22
Bosch Security Systems, Inc.
User Manual
F.01U.193.295
Rev. 05
CHAPTER 3
Operation
Setup Instructions
1. Attach the power pack to the DSI 2008.
2. Apply power to all components.
3. Confirm the power indicator is lit on the DSI 2008 front panel.
NOTE: The power indicator flashes when a call signal is received from a 2-wire line, if the call signal option board
is attached. The DSI 2008 level displays should help to confirm which line is calling.
4. Use the level adjust trimmers to fine tune the listen levels.
NOTE: For 4-wire systems other than ADAM, ADAM-M ADAM CS, Zeus and Zeus III, you may have to change
the setting of the 4W LEVEL REF SEL control to establish the correct level. For 2-wire system other than
Audiocom, and TW, you may have to adjust the level at the 2-wire system if you cannot establish the correct
level with the 2-wire listen level trimmers.
Seitenansicht 22
1 2 ... 18 19 20 21 22 23 24 25 26 27 28

Kommentare zu diesen Handbüchern

Keine Kommentare